Mechanically Attached Fitting ... the weldless, threadless way to join pipe/tube
Head Office: 1-877-643-8823

Tube-Mac's PYPLOK® Technology Long History with Shell Oil

 

SHELL SARWAK (South Furious offshore platform) installed in 1994 over 20 years ago. 

PYPLOK® on 1" NPS schedule 80 stainless steel pipe for instrumentation manifold system operating at 100 PSI.

SHELL Sydney Australia installed early 1990 over 20 years ago.
PYPLOK® installed on 3/4" NPS steam line (100°C ).

SHELL Bukom Singapore installed 2013.
PYPLOK® 1/2" and 1" NPS installed on steam line for steam trap replacement.
Also 2" and 3" NPS installed on gas distribution line.

SHELL BRUNEI installed in 2009 to present.
Instrument Air – 3/4" and 2" NPS 316 SS couplings, 90° Elbow and 150# Flange x PYPLOK®.
Crude oil, condensate and gas distribution – 1/2" - 2" NPS 316 SS fittings.

story3